Construction of 1No 6 – unit classroom block at Dansokrom

Infrastructure Category: Educational Infrastructure
GPS Address: WB-2909-8233
Status: Completed
Project Description: This project has been completed and handed over to the community to address the challenge of physical accessibility to basic education in Dansokrom and its environs. The successful construction of the project has increased enrolment rates at all levels. The project was started in 2017 by the Bibiani Anhwiaso Bekwai Municipal Assembly with funding from the District Assemblies Common Fund(DACF) and was completed in 2018.

Posted in Projects.

Leave a Reply

Your email address will not be published. Required fields are marked *